Curry's Distribution Centre, Avonmouth

Client:

DSG Retail

Contractor:

Bowmer + Kirkland

M&E Value:

£2.4 Million

Completion Date:

January 2006

About The Project:

Curry’s RDC Distribution Centre is located at Western Approach Business Park, Bristol.

The project involved the construction of a 250,000 square foot warehouse with a two storey main office block as well as several small integral offices within the main warehouse.

The design and build installation of the mechanical and electrical services included:

Photos © B+K

Mechanical Scope:

  • High velocity ventilation ductwork system to the main warehouse storage area
  • Independent supply and extract air handling ventilation plant systems
  • Public health installation infrastructure
  • Comfort cooling to the main offices
  • Communications room close control air conditioning system
  • Fully networked H and V building management control system

Electrical Scope:

  • New 1600KVA packaged sub-stations
  • An 800KVA containerised generator
  • Emergency lighting and central battery system
  • Lighting busbar distribution system
  • Fire alarm system
  • Security systems including CCTV, access control and intruder alarms
  • Data cabling installation