Menu
Project Sectors Menu

Commercial Warehousing

Curry's Distribution Centre, Newark

Client:

DSG Retail

Contractor:

Bowmer + Kirkland

M&E Value:

£5.1 Million

Completion Date:

January 2006

About The Project:

This Curry’s distribution centre is located at Newlink Business Park, Newark.

The project involved the construction of a distribution warehouse with an integral office block and a remote gatehouse.

The building consists of 700,000 square foot of warehouse space split across 3 chambers each with internal office pod buildings. Two of the chambers are used for bulk storage and the third is a fully automated small projects facility.

The design and build installation of the mechanical and electrical building services included the following:

Photos © B+K

Mechanical Scope:

  • New incoming gas and water supplies
  • External fire hydrant ring main
  • 3 high velocity ventilation ductwork systems
  • Various supply and extract air handling ventilation plant systems
  • Hot water plant and distribution system to the main offices and the 3 warehouse pod offices 
  • Communications room close control air conditioning systems
  • Public health and installation infrastructure
  • Fully networked H and V building management control system

Electrical Scope:

  • New incoming supply rated at 4MVA
  • 11kv distribution panel
  • 3 package sub-stations
  • A 11kv generator rated at 2MVA
  • 3 LV sub-distribution panels complete with HMC and PLC controls logic
  • 3 emergency lighting central battery systems
  • 4500 light fitting
  • Full daylight linked automatic lighting control system
  • Fire alarm installation including high level beam detectors
  • Full security system including CCTV, access control and security alarms
  • Data network installation